Project DateDetails of Services Provided
22.6.21Fire Services Smoke extraction in HKIA, P581, T1 extension
17.3.21Ir Dr Lip wrote a report of replacing GI conduit with UPVC conduit at University of Science & Technology Quarter construction, in which he is the Supervising Engineer of Paul Y (E&M) Engineering Ltd. for installing Electrical, fire, and plumb drain installations
9.3.21MVAC Cooling Tower CT2B at Lai Chi Kok Government Office Building, Mei Foo.
8.3.21MVAC Cooling Tower CT1B at Hong Yip Street, Tung Tau Centre, Yuen Long.
18.1.21Ir Dr as Commissioning Authority of T&C work for schools A&B at Pak Fuk Road, North Point (Contract no. SS D515)
19.12.20Ir Dr as Commissioning Authority of T&C work for Tuen Mun residential project at TMTL435, Castle Peak Road, Tai Tam Area 55, Siu Sau, Tuen Mun, NT.
27.11.20T&C work for record, plan, report endorsement for MVAC, Electrical, Plumbing & ELV installations at TKO Industrial Estate, Commercial Building at Chung Cheong Street/Chun Yat Street
3.11.20Air-conditioning cooling tower vetting and endorsement of CT1B submissions to EMSD for Lap Kei Engineering Ltd. at Lai Chi Kok Government Office Building
21.10.20Lighting upgrade at Yat Nga Court, Tai Po, NT. subsidized by CLP Eco fund
12.10.20Fire Rating Resistance investigation, site visit, preparation of report and RPE Fire signature at Fanling Wholesale Market Management Building
26.9.20Fire smoke extraction testing at South Horizon MTR station, Hong Kong.
26.8.20Fire smoke extraction testing at Choi Hung MTR with subcontractor REC and MTR staff Mr Cheung and Mr Wong.
11.8.20Fire smoke extraction inspection and certification at Lohas Park Mall, Tseung Kwan O with subcontractor REC
22.5.20Staircase pressurization site testing for Revitalization of Central Police Station Compound and endorsement of documents to FSD.
19.5.20Emergency generator inspection at Singapore International School at Wong Chuk Hang and endorsement of drawings to Environmental Protection Department
25.4.20Air conditioning cooling tower audit for Tin Shui Wai, Water Supply Dept. Regional Office, Contract No. SS C504
23.1.20Inspection & Certification of MVAC installations at Parkone Nam Cheong Street, Shum Shui Po, Kowloon.
20.1.20Inspection & Certification of Electric Vehicle Charger installations at Castle Peak Road, Castle peak Bay, Area 48, Tuen Mun TMTL542